Hanging Structures Procedure
English
Contenedor Gavias lozin
PROCEDURE FOR HANGING STRUCTURES IN the "EL SARDINERO" HALL
Procedure for the installation of hanging structures in the Salón El Sardinero and Diagram of trusses and permitted loads.
This procedure sets out the guidelines to be followed, both for the preparation of applications for the hanging of structures, and for the assembly and disassembly operations of the same.