Hanging Structures Procedure

English
Contenedor Gavias lozin

PROCEDURE FOR HANGING STRUCTURES IN the "EL SARDINERO" HALL

<-Back to Documentation

Procedure for the installation of hanging structures in the Salón El Sardinero and Diagram of trusses and permitted loads.
DOWNLOAD PDF
DOWNLOAD DWG

This procedure sets out the guidelines to be followed, both for the preparation of applications for the hanging of structures, and for the assembly and disassembly operations of the same.


Accessibility menu
Contrast settings
Font size
Letter spacing
Line height
Images
Font
Big cursor
Reading line
Reset the settings